Good Papers

Risk-Averse Online POMDP Planning via CVaR of the Immediate Cost with Performance Guarantees

Applying CVaR to the immediate belief cost targets per-step state uncertainty while preserving standard MDP structure, enabling any expectation-based planner to become risk-sensitive with unchanged algorithms and end-to-end finite-time guarantees.

Yaacov Pariente, Vadim Indelman

Published 2026Atlanta Poster Session 4 · Thu, Dec 10, 4:30 PM–7:30 PM local time · Hall C1arXiv ↗OpenReview ↗

74%
OverallHighly rated
?
OverallHighly ratedVote to see the scoreThe exact score shows once you've voted, so every vote is your own call. The first half of each home page shelf shows its scores.
Readers
–

Only vote on papers you've read. Sign in with GitHub to vote.

AI panel9/20reviewers recommend it
lenient 2/5
medium 6/10
strict 1/5
AI panel?Vote to see what the 20 AI reviewers said

Abstract

Online POMDP planners optimize the expected cumulative cost, which can mask dangerous states when the belief places significant mass on high-cost states. Existing risk-averse methods apply static or dynamic Conditional Value at Risk (CVaR) to the value function, capturing trajectory-level risk, but share two gaps: (i) by retaining the immediate cost as an expectation of a state-dependent cost over the belief, the risk \emph{within} the belief is left unaddressed; and (ii) by modifying the value function, they require new tailored algorithms rather than reusing existing expectation-based planners. We instead apply CVaR to the immediate cost over the belief at each step, directly targeting per-step uncertainty about the current state. The standard expected cumulative return is retained as the objective, so the resulting problem has a standard MDP structure: any expectation-based POMDP planner can be made risk-sensitive by changing only the cost computation. We inherit finite-time guarantees for policy evaluation and sparse sampling---with estimation error independent of the risk level---and, as our central theoretical result, prove a finite-time bound on the gap between the particle belief MDP surrogate and the original POMDP, which together yield an end-to-end guarantee from the true POMDP value to the algorithmic estimate. In the risk-neutral limit, the formulation recovers standard expectation-based planning.